1
2026-06-22 07:09
6U Rack Fixing And Commsioning of Network Switch With LIU
3500.00
Active
Action
Toggle Dropdown
2
2026-05-19 07:10
8 module Switch Box Eletrical Point
2500.00
Active
Action
Toggle Dropdown
3
2026-07-20 15:35
CCTV Camera Location changing and Termination of cat-6 cable with DC connecter and Video Ballon
750.00
Active
Action
Toggle Dropdown
4
2022-04-21 10:21
Data Recovery and Buck-up
400.00
Active
Action
Toggle Dropdown
5
2025-02-19 08:17
Desktop Assembling
800.00
Active
Action
Toggle Dropdown
6
2025-02-06 18:24
Desktop service include windows installation all over service Charge
800.00
Active
Action
Toggle Dropdown
7
2025-01-09 09:48
DVR Installation and configuration Charges
2500.00
Active
Action
Toggle Dropdown
8
2025-01-22 21:08
Electrical installation and commissioning charges
2500.00
Active
Action
Toggle Dropdown
9
2026-05-20 08:15
Eletrical Earth 4 Feet
6500.00
Active
Action
Toggle Dropdown
10
2026-06-22 07:11
Fiber cable Splicing and Fixing Of Couplers with Fiber Encloser Box
1500.00
Active
Action
Toggle Dropdown
11
2025-01-22 20:50
Firewall Installation and commissioning Charges
5500.00
Active
Action
Toggle Dropdown
12
2025-02-18 18:49
Fixing and commissioning of wireless access point over sealing with all suitable fitting accessories
1200.00
Active
Action
Toggle Dropdown
13
2026-05-19 07:07
Fixing of 43 inch TV over wall
800.00
Active
Action
Toggle Dropdown
14
2026-07-20 15:41
Fixing of 6U Network Rack with Power manager and Network Poe Switch with all Suitable Fitting Accessories
3500.00
Active
Action
Toggle Dropdown
15
2025-01-09 09:46
Fixing of cctv camera with all suitable fixing accessories
350.00
Active
Action
Toggle Dropdown
16
2022-04-21 10:21
Fixing of cctv camera with all suitable fixing accessories with Back Box and connecting of DC pin and Video Ballon and termination of Cat6 Cable include visiting charges
800.00
Active
Action
Toggle Dropdown
17
2025-02-18 18:50
Fixing of Door access with EM lock, Biometric installation with RFID card reader and configuration charges
2500.00
Active
Action
Toggle Dropdown
18
2026-07-20 15:37
Fixing of IP Camera with Back Box set Onley Fixing configuration will not Done location changing charges will be extra
450.00
Active
Action
Toggle Dropdown
19
2026-06-17 06:12
Generel 1
1000.00
Active
Action
Toggle Dropdown
20
2026-06-17 06:16
generel 2
1000.00
Active
Action
Toggle Dropdown
21
2026-06-17 06:16
generel 3
1000.00
Active
Action
Toggle Dropdown
22
2026-06-17 06:17
generel 4
1000.00
Active
Action
Toggle Dropdown
23
2026-06-17 06:18
generel 5
1000.00
Active
Action
Toggle Dropdown
24
2025-01-09 09:51
Installation and Fixing of Rack Box and DVR Configuration commissioning charges
2000.00
Active
Action
Toggle Dropdown
25
2025-02-15 12:14
Intercom Installation and Configuration charges
2500.00
Active
Action
Toggle Dropdown
26
2025-01-29 11:51
Inverter Battry Installation
1200.00
Active
Action
Toggle Dropdown
27
2025-02-10 17:31
Laptop Hinges service
900.00
Active
Action
Toggle Dropdown
28
2026-07-02 12:49
Laying CAT-6 UTP cable without PVC conduct with suitable fitting Accessories Per meter
20.00
Active
Action
Toggle Dropdown
29
2026-06-22 07:08
Laying of 2 core Out Door Fiber cable without HDPE pipe
20.00
Active
Action
Toggle Dropdown
30
2025-01-09 09:54
Laying of cable with PVC conduct with suitable fitting Acceries Per meter
45.00
Active
Action
Toggle Dropdown
31
2025-01-09 09:55
Laying of cable without PVC conduct with suitable fitting Acceries Per meter
20.00
Active
Action
Toggle Dropdown
32
2026-06-22 07:15
Laying of Cat6-Utp Out Door Armoured Cable Without conduct
15.00
Active
Action
Toggle Dropdown
33
2025-01-22 12:27
Mother board service H81
2000.00
Active
Action
Toggle Dropdown
34
2026-06-11 02:59
Network file sharing and commissioning charges
2500.00
Active
Action
Toggle Dropdown
35
2025-02-11 11:14
Network installation and configuration commissioning charges
1200.00
Active
Action
Toggle Dropdown
36
2025-01-25 09:58
Networking cabling and Crimping of Rj-45 connecter Testing and Fixing Charges Per End
150.00
Active
Action
Toggle Dropdown
37
2025-01-13 21:43
Numbering of Network cable testing of Network Point Rack Side and User side both End
80.00
Active
Action
Toggle Dropdown
38
2026-05-19 07:04
Printer Installation And Setup configration for Dedicated PC
1500.00
Active
Action
Toggle Dropdown
39
2025-01-09 09:57
Running of GI Cable Tray with All suitable Fitting Accessories
180.00
Active
Action
Toggle Dropdown
40
2025-01-22 20:51
Server configuration charges
4500.00
Active
Action
Toggle Dropdown
41
2026-05-19 07:33
Server Room 42U Network Rack Floor Mount
4500.00
Active
Action
Toggle Dropdown
42
2025-01-24 12:31
System assembling and installation charges
1500.00
Active
Action
Toggle Dropdown
43
2025-01-22 15:31
Tally Support
1200.00
Active
Action
Toggle Dropdown
44
2025-01-13 21:39
Termination Network cable and fixing and commissioning of Information Outlet End to End
300.00
Active
Action
Toggle Dropdown
45
2026-07-20 15:46
Termination of Cat-6 Utp Rj-45 connecter and Testing of Network cable End to End with connectivity checking
200.00
Active
Action
Toggle Dropdown
46
2025-02-06 10:10
Tonner Refelling
450.00
Active
Action
Toggle Dropdown
47
2022-04-21 10:21
Troubleshooting and Networking Support include Visiting Charges with tally name server network mapping
800.00
Active
Action
Toggle Dropdown
48
2025-01-09 10:10
Ups Battry Installation
800.00
Active
Action
Toggle Dropdown
49
2025-01-03 22:52
WIFI Camera Installation ( include visiting Charges)
800.00
Active
Action
Toggle Dropdown